Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

[/fusion_text]

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Military Hospital

Project Location :  Baku / Azerbaijan
Type of Project :  General Hospital
Investor :  Government of Azerbaycan
Architect :  Geyran Architects
Project Manager :  Koza AS
Total Area of Construction :  10.200 m2
Bed Capacity :  50
Project Budget :  22 Million USD
Medical Equipment Budget :  5 Million USD
Project Start :  2008
Project Finish :  Ongoing

asm-400x200

King Hussein Institue for Biotechnnology & Cancer Center

Project Location :  Amman / Jordan
Type of Project :  Oncology and Research Center
Investor :  Government of Jordan
Architect :  De Wolff Partnership
Project Manager :  Koray İnternational
Total Area of Construction :  120.000 m2
Bed Capacity :  280
Project Budget :  250 Million USD
Medical Equipment Budget :  60 Million USD
Project Start :  2009
Project Finish :  Ongoing

asm-400x200

Memleket Medical Center

Project Location :  Tepecik / Izmir, TURKEY
Type of Project :  General Hospital
Investor :  RHEA
Architect :  HAS Architects
Project Manager :  Mentor Ltd / Turkey
Total Area of Construction :  11.000 m2
Bed Capacity :  50
Project Budget :  19 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2008
Project Finish :  

asm-400x200

Memleket Medical Center

Project Location :  Kayseri / Turkey
Type of Project :  General Hospital
Investor :  Özel Memleket Sağlık Hizmetleri
Architect :  Ali Talhaoğlu / Turkey
Project Manager :  Ali Talhaoğlu / Turkey
Total Area of Construction :  22.000 m2
Bed Capacity :  110
Project Budget :  30 million USD
Medical Equipment Budget :  7 million USD
Project Start :  2005
Project Finish :  2008

asm-400x200

Yeni İsviçre Hospital

Project Location :  Istanbul / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Murtas AS
Architect :  Proje Yönetim AS
Project Manager :  Proje Yönetim AS
Total Area of Construction :  35.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  26 million USD
Project Start :  2007
Project Finish :  Hold

asm-400x200

Ceyhan Sağlık Hizmetleri

Project Location :  Adana / Turkey
Type of Project :  General Hospital
Investor :  Ceyhan Saglık Hizmetleri
Architect :  Talha Architect
Project Manager :  Talha Architect
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  14 million USD
Medical Equipment Budget :  4 million USD
Project Start :  2007
Project Finish :  2008

asm-400x200

Özel Edremit Körfez Hospital

Project Location :  Balıkesir / Turkey
Type of Project :  General Hospital
Investor :  Özbeyler AŞ
Architect :  Gunter Tuner
Project Manager :  Lider Yapı Denetim
Total Area of Construction :  8.000 m2
Bed Capacity :  60
Project Budget :  18 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish :  2010

asm-400x200

Özel Ren Tıp Hospital

Project Location :  Bursa / Turkey
Type of Project :  General Hospital
Investor :  Ren Tıp AS
Architect :  Geyran Architects
Project Manager :  Ren Tıp Ltd
Total Area of Construction :  9.600 m2
Bed Capacity :  70
Project Budget :  20 Million USD
Medical Equipment Budget :  6 Million USD
Project Start :  2008
Project Finish : Ongoing

Sağlık

asm-400x200

Anadolu Sağlık Merkezi

Project Location :  İzmit / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Anadolu Health & Education Foundation
Architect :  REES & HAS Architects
Project Manager :  Proje Yönetim LTD
Total Area of Construction :  45.000 m²
Bed Capacity :  209
Project Budget :  120 million USD
Medical Equipment Budget :  38 million USD
Project Start :  June, 2002
Project Finish :  February, 2005

asm-400x200

Ortadoğu Sağlık Merkezi

Project Location :  Urfa / Turkey
Type of Project :  General Hospital with Oncology Clinic
Investor :  Uzmanlar Saglik Inc.
Architect :  MS Architects
Project Manager :  MS Architects
Total Area of Construction :  31.000 m²
Bed Capacity :  230
Project Budget :  48 million USD
Medical Equipment Budget :  11 million USD
Project Start :  March, 2006
Project Finish :  September, 2008

asm-400x200

National Emergency Hospital

Project Location :  Astana / Kazakhstan
Type of Project :  Accidental and Emergency Hospital
Investor :  Govenment of Kazakhstan
Architect :  AE Architect
Project Manager :  AE Architect
Total Area of Construction :  28.000 m2
Bed Capacity :  240
Project Budget :  70 million USD
Medical Equipment Budget :  18 million USD
Project Start :  2006
Project Finish :  2008

asm-400x200

Yıldızlı Hearth Hospital

Project Location :  Trabzon / Turkey
Type of Project :  Cardio Vascular Surgery Hospital
Investor :  Yıldızlı Hearth Hospital
Architect :  ACS Architect
Project Manager :  ACS Architect
Total Area of Construction :  11.000 m2
Bed Capacity :  60
Project Budget :  16 million USD
Medical Equipment Budget :  5 million USD
Project Start :  2007
Project Finish :  2009

asm-400x200

Özel Reyap Hospital

Project Location :  Tekirdağ / Turkey
Type of Project :  General Hospital
Investor :  Private
Architect :  Nazmi Aydoğmuş
Project Manager :  Nazmi Aydoğmuş
Total Area of Construction :  11.500 m2
Bed Capacity :  110
Project Budget :  20 million USD
Medical Equipment Budget :  6 million USD
Project Start :  2008
Project Finish :  2010